PowerWash Pros
Member
We just completed this moss rock "restoration" job. It was painted white, double coated of course. We did the building, 2 front signs and 15 pillars along the edge of the lot...
This was a long grueling 5 day job. Not to mention 99 degrees in a rubber suit with strep throat.
Here are the photos.
This was a long grueling 5 day job. Not to mention 99 degrees in a rubber suit with strep throat.
Here are the photos.