Christopher
Moderator
I have done many, many jobs where I needed 300' to 500' of pressure hose and one time over 1025' to reach a property to do a job. I did some of it with the X-Jet (a couple buildings) and then just put the injector on the last 100' or 200' of pressure hose for the rest of the buildings.
I used containers with lids so chemical would not spill and had no problems doing this. There are many different ways to do this so it is not that hard to do. You don't have to carry the containers yourself, use tools.
Sometimes you will need a lot of hose to do a job, it is how it is sometimes.
I used containers with lids so chemical would not spill and had no problems doing this. There are many different ways to do this so it is not that hard to do. You don't have to carry the containers yourself, use tools.
Sometimes you will need a lot of hose to do a job, it is how it is sometimes.