Does the Fatboy requires limitation on the hose length. Would 300' of 1/2" poly affect the normal operation of the pump?
Also in the manual is not mentioned anything about wiring it with fuse and switch. Does the "on demand" switch work as a long term switch or I should put a switch as well? How many amps fuse would be proper for the Fatboy?
I read people replace the relay; what model relay do you guys replace it with and where do you buy it from? Should I replace it prior use just to be on the safe side in case the pump burn down during a job?
I know I could ask Bob with all these questions, but I am planning to put it on tomorrow (Sunday).
Thanks,
D
I currently run 300 feet of Goodyear pliovic 1/2 hose and have been for a year with zero problems :clapping:Does the Fatboy requires limitation on the hose length. Would 300' of 1/2" poly affect the normal operation of the pump?
Also in the manual is not mentioned anything about wiring it with fuse and switch. Does the "on demand" switch work as a long term switch or I should put a switch as well? How many amps fuse would be proper for the Fatboy?
I read people replace the relay; what model relay do you guys replace it with and where do you buy it from? Should I replace it prior use just to be on the safe side in case the pump burn down during a job?
I know I could ask Bob with all these questions, but I am planning to put it on tomorrow (Sunday).
Thanks,
D
as far as I know there is no such thing, I use a Titan (best money I ever spent):dirol:Thanks guys,
Its all clear now . Any idea for cheap temporary chem reel (plastic or something) that will fit 300'?
At the moment budget cannot afford Titan .
Russ, I was just searching on ptstate about dual 12 volt setups and ran across your post from awhile back. I'm having trouble getting the pages to load over there. Anyway, did you replace the dual delavans with the fatboy or is this a different rig??
<EMBED src=http://www.youtube-nocookie.com/v/xhOvZyy7vuM&hl=en&fs=1&border=1 width=445 height=364 type=application/x-shockwave-flash allowfullscreen="true" allowscriptaccess="always"></EMBED>