Thanks guys.
Benjamin - I mounted the 125 tank over dead center of the middle of the two axles. For the most part it will be pulled empty or with maybe 30-50 gallons of chem in it, and finish the mix at the job. Eventually this will probably become my supply tank, and get another tank same size or smaller for chem and placed directly infront of the current tank, and then move both tanks back a few feet.. Working on a new 8gpm hot water skid (the plan anyway) and will probably mount it on the front.. I don't want too much tongue weight, but I also don't want a bunch of weight on the ass end either. But so far it pulls like a dream. Very happy with everything so far. And after landing some solid work this week, everything is just about paid for in full, as well as now having full coverage insurance for residential and commercial. Makin way!
Sent from my iPhone using Tapatalk