I want to thank everyone for their input, but here is what happened. I have decided not to do the job. The contractor, after accepting my bid told me that I could start last Wednesday because the carpenters would be out of the structure. Well this place is about 45-miles one way from my home. I got there Wednesday with my trailer and there had to be 20-carpenters all over the place. I got ahold of the contractor who hired me and he was unaware that they were still working on the house. I tried to understand and rescheduled for Today (Monday), the contractor assured me that I would have the building all to myself to clean up the inside and out. I drove the 45-miles one way only to find 6-contractors inside installing the AC & Heat duct work. Duct work was lying all over the place inside and out. I find out that these folks were suppose to do there work on Friday but decided to take the day off instead. The contractor that hired me wasn't around. I tried his cell number and got an answering machine. I left a message stating that he needs to get someone else to do the job. I am through driving that distance without earning a dime. I can understand it happening once but twice? When it happened the first time I told him I could do it later this week but he insisted it had to be done on Monday. I am sure he didn't know the AC people were there today. So what would you guys have done about this??? Do you agree with me or not??? Hugh