Tony Shelton
BS Detector, Esquire
I'm mounting a PW on my lift. I have limited space to work with so I'm not going to be able to have a feed tank. The plan is to hook this one up to a water source each time and not use a tank at all if I can help it.
The question is, how much coiled return hose do I need to keep the temps down on water returning to the pump from the unloader if I plan on letting the unit run for as much as 15-20 minutes with the gun closed?
I am unfamiliar with the temperature rise as the water goes through the pump. Am I going to be forced to use a radiator with an electric fan or can I use maybe 20-30 feet of coiled hose and be ok?
Any ideas?
The question is, how much coiled return hose do I need to keep the temps down on water returning to the pump from the unloader if I plan on letting the unit run for as much as 15-20 minutes with the gun closed?
I am unfamiliar with the temperature rise as the water goes through the pump. Am I going to be forced to use a radiator with an electric fan or can I use maybe 20-30 feet of coiled hose and be ok?
Any ideas?