Which would you do first?

Clear Shine

New member
I have 2 extra motors that I will be making into 8gpm softwash rigs. These wont be for doing concrete, but only for softwashing and rinsing. I am planning on adding one to my rig and the other one to the bed of my truck just for doing housewashes (100 gal tank/20 gal chem tank and 2 hose reels on pallets that can slide in and out of the truck).

I now have 2 trucks, one for pulling my rig that has one 5.5 hot machine and the other truck will be for sales/small jobs/back up truck. I will be building one of them this next winter, but which should I do first? Should I put it on my sales/2nd truck or should I put it on my trailer with my hot unit?
 
Back
Top