Me and my tech did 35,000 sf of awful concrete last two days. Drainage issues and lots of mud.
Gotta go back in a few weeks and do 35000 more. A striping company wants to paint over the old lines and didn't want us to wash first so they would not have to re layout the lines. They want us to wash after painted. Go figure.